#launch
3 guides tagged #launch on ChangeGamer. Includes The MCP Server Production Launch Checklist.
Guides
- The MCP Server Production Launch Checklist A phase-by-phase go/no-go checklist for launching an MCP server: checkable gate conditions for transport and auth, tool design, cross-client testing, publish readiness, observability, and ongoing operation — with links to the mechanics each gate depends on.
- Voice Agent Launch Checklist: The Go/No-Go Gates Before Real Callers A voice agent launch checklist as yes/no gates: scope, offline replay, per-stage latency, barge-in, tools, transport, handoff, cost, guardrails, monitoring and rollback, each with a pass signal and the article that owns the method.
- A2A Production Launch Checklist: Gates to Pass Before You Ship A go/no-go checklist for launching A2A agent-to-agent delegation, one line per gate, each pointing to the article that owns the detail: need, card, states, binding, auth, trust, versioning, failure.